Please be informed that format of delivery date confirmation has been modified. From 1st Jan 2024 expected delivery date refers to arrival at destination. This is valid for orders placed after 1/1/2024 only.
Shows 2 product(s)
Substations, DSA1 MINI, Biomass, HT_EM_IT, 15.0 kW
BIOMASS_HT_EM_IT: EM Sonometer, primary bottom/secondary bottom, High Temperature, PN 25, SV 3bar INAIL
Substations, DSA1 MINI, Biomass, HT_EM_IT, 60.0 kW
BIOMASS_HT_EM_IT: EM Sonometer, primary bottom/secondary bottom, High Temperature, PN 25, SV 3bar INAIL