Please be informed that format of delivery date confirmation has been modified. From 1st Jan 2024 expected delivery date refers to arrival at destination. This is valid for orders placed after 1/1/2024 only.
Shows 7 product(s)
Room controller, FED, Capillary tube [m]: 2+2+2
FED sensor for sequence control of cooling and heating circuit, 2+2+2m
Room controller, FED, Capillary tube [m]: 4+11
FED sensor for sequence control of cooling and heating circuit, 4+11m